New Waterford Community Hub

Architecture49 Inc.
2024
Completed in 2024 with our partners at Architecture49, BMR served as the lead structural consultant on this 100,000 square foot, secondary & high school educational facility built to replace the existing Breton Education Centre. Built to meet LEED silver standards, this facility will form part of the innovative New Waterford Community Hub project. The educational component of the Community Hub includes a technical education wing, double gymnasium, library, atrium-style cafeteria, media & production labs, music space, nutritional learning, and future theatre. The structural steel building frame was designed to integrate the phase two Health Centre component of the project, which is now underway.
BMR’s services included design development, structural design and preparation of construction documents, BIM collaboration, detailed construction specifications, and tender & construction administration.
Key Points
- Designed to integrate the phase two Health Centre component of the Community Hub project